Bond Referendum 2016
-
Referendum Project Update: 11/19/2019
Completed Projects
Projects are now complete.- VES Installation of a Second Parking Lot Exit (COMPLETED 8/22/16)
- UMS Restoration of the Gym Floor (COMPLETED 8/12/16)
- OHES Replacement of the Media Center carpet (COMPLETED 8/15/16)
- MHS Installation of Walkway to Route 601 (COMPLETED 5/31/17)
- MHS Resurfacing the Track (COMPLETED 8/14/17)
- OHES Asphalt Replacement in Back Playground area (COMPLETED 8/17/17)
- UMS Media Center Renovations (COMPLETED 8/29/17)
- OHES Boiler Replacement (COMPLETED 8/17)
- OHES Kindergarten Bathroom Renovations (Partial Complete 8/17)
- OHES Both Gym Floors & Divider Replacement (Complete 9/17)
- VES Partial Roof Replacement (COMPLETED 8/17)
- LMS Media Center Carpet Replacement (COMPLETED 8/17)
- LMS Boiler/Chiller Replacement (COMPLETED 8/17)
- UMS Home Economics Room Conversion to Art Studio (COMPLETED 8/17)
- UMS Bathroom Renovations (COMPLETED 8/17)
- UMS Roof Replacement (COMPLETED 8/17)
- MHS Installation of Aspalt at Cougar Stadium Entrance (COMPLETED 8/17)
- UMS Gym Bleacher/Divider Replacement (COMPLETED 9/17)
- UMS Track Replacement (COMPLETED 10/17)
- OHES Roof Replacement (COMPLETED 10/17)
- LMS New Playground (COMPLETED 10/17)
- LMS Roof Replacement (COMPLETED 11/17)
- VES Music Room Alterations (COMPLETED 1/18)
- UMS Tennis Courts (COMPLETED 5/18)
- OHES Windows Replacement (7/21/18)
- OHES & VES Bathroom Renovations (COMPLETED 9/11/18)
- MHS Locker Room/Restroom Epoxy Floors Replacement (COMPLETED 9/12/18)
- UMS Parent Pickup Area Renovation (COMPLETED September 2019)
- MHS Sidewalk Replacement (COMPLETED September 2019)
- UMS Paving of Transportation Parking Lot (COMPLETED November 2019)
- UMS Replacement of Underground Storage Fuel Tanks (COMPLETED November 2019)
Planned Projects
- ALL COMPLETE